Regional Sites
Hong Kong
Philippines
Singapore
Thailand
An Overview
Our Aim & Values
Who We Serve
Our Management
Our Milestones
Where We Operate
Our 90
th
Anniversary
Introduction
What We Do
Contracting
Services
Products & Sourcing
Who We Serve
Buildings
Environmental Infrastructure
Power & Energy
Transportation & Logistics
By Location
All Regions
Hong Kong
China
Macau
Philippines
Singapore
Thailand
Others
What We Do
Contracting
Services
Products & Sourcing
Who We Serve
Buildings
Environmental Infrastructure
Power & Energy
Transportation & Logistics
Introduction
Group EHS Vision
Health & Safety Policy
Enviromental Policy
JEC in the Community
News & Events
Publications
JEC Magazine
Company Brochure
Environmental, Health & Safety Report
Solution Brochure
Careers at JEC
Career Development
Current Opportunities
Contracting
Services
Products & Sourcing
Buildings
Green Building Technologies
Commercial & Residential
Leisure & Recreation
Institutional
Industrial & Others
Environmental Infrastructure
Power & Energy
Transportation & Logistics
All Regions
Hong Kong
China
Macau
Philippines
Singapore
Thailand
Others
Leisure & Recreation
Recent Projects
-- Location --
Hong Kong
China
Macau
Philippines
Singapore
Thailand
Others
Project
Region
Kennedy Town Swimming Pool Water Treatment Plant
JEC supplied and installed the water treatment plant for Kennedy Town Swimming Pool, Hong Kong. JEC provided a comprehensive solution, from consultation to commissioning, which was delivered on time and to specification.
Hong Kong
Marina Bay Sands Operable Wall
JEC Singapore designed, supplied and installed the largest operable wall system in the world for the Marina Bay Sands Expo and Convention centre and the linen chute for the three adjoining hotel towers.
Singapore
YMCA LED Lighting
JEC supplied and installed a variety of energy saving Light Emitting Diode (LED) products and a lighting control system for the renovated YMCA building in Tsim Sha Tsui, Hong Kong.
Hong Kong
MGM Grand CAST System
JEC installed a CAST system for handling cash, notes, personal cheques and documents between game tables, cashiers, and the vault at the MGM Macau.
Macau
Venetian Cotai Building Products and Backup Power System
At the Venetian Cotai Macau JEC supplied and installed generator sets, pumps, sanitaryware and flooring.
Macau
The Oriental Hotel River Wing Renovation E&M Installation
JEC Thailand designed, supplied, and installed a range of key E&M systems that included: the Air-Conditioning & Ventilation system, Plumbing & Fire Protection system, Electrical & Communication system, and Building Automation system.
Thailand
Mountain Shadow Golf Club E&M Installation
JEC Thailand designed, supplied and installed the Air-conditioning & Ventilation, and Electrical & Communication systems for the club house of the Mountain Shadow Golf Club (previously named Panya Hill Golf Club).
Thailand
Delta Grand Pacific Hotel E&M Installation
JEC Thailand designed, supplied and installed the Air-Conditioning and Ventilation system for this 5 star hotel.
Thailand
Sheraton Grande Laguna Beach E&M Installation
JEC Thailand supplied and installed the hotel's Air-Conditioning and Ventilation system
Thailand
Novotel Lotus Hotel E&M Installation
JEC Thailand designed, supplied, and installed the hotel's Air-conditioning and Ventilation system.
Thailand
Previous
1
2
Next