JEC Project:
Coca-Cola Bottlers Supply and Installation of Air-Conditioning System, the Philippines

DeveloperCoca-Cola Bottlers Philippines
JEC ScopeSupply and Installation of HVAC system
LocationPhilippines
Project Completion Date2010

JEC Philippines supplied and installed an air-conditioning system for Coca-Cola Bottlers in Sta. Rosa, Laguna and Davao City, Philippines in 2010.

Ventilation System for Tea Extraction Plant, Sta. Rosa
JEC designed and installed the ventilation system for the tea extraction processing area, cleaning in place plant, magurit drum cutter, and thawing area for the Coca-Cola plant in Sta. Rosa, Laguna.

The ventilation system requires specific air change requirements which are set by Coca-Cola’s research and development department. These requirements are critical for product storage.

Part of JEC’s handover procedure after product installation, was to provide formal training for operation and maintenance staff for ongoing maintenance services. This ensured that on-site engineers follow the correct procedures to properly maintain the new equipment.

Renovation of Air-Conditioning System, Davao City Plant
To improve energy efficiency in syrup filling rooms 3 & 4, and the chilled water cooling system at Coca-Cola’s plant in Davao City, JEC identified defective equipment that required replacement such as chillers, air handling units, cooling towers, pumps and electrical controls. JEC also designed and installed a new air-conditioning system for the renovation of these areas.

Image A member of the Jardine Matheson Group